This page require Adobe Flash 9.0 (or higher) plug in.

Billede
Kapaciteten under pres
Europa er for alvor ved at trække sig ud af den finansielle krise. Vi har gennem længere tid kunnet mærke et...

Klik for at læse mere


Vinder på tid og troværdighed


Danish(DK)   English (United Kingdom)
Udskriv

Our facilities

After 136 years on the dock-side at Vejle Harbour, we moved to our new premises at Vejle North on the 25th January 1999.

oh-luftfoto550

Facts on our facilities:
1.800 m2 Building 1 Docking Terminal, 16 loading ramps
1.650 m2 Building 2 Logistics warehouse
2.000 m2 Building 3 Logistics warehouse with 4 loading ramps
1.200 m2 for administration, canteen, personnel facilities and a squash court

8.000 m2 parking and truck docking area
24.000 m2 total land-area

All 3 buildings are heated to min. 10 degrees. C.
The terminal has a height of 4,5 metres under the ceiling, and the 2 warehouses of 7,5 m. under the ceiling. The buildings 2 and 3 are partially equipped with pallet-racks, for EUR pallets (120 x 80 cms) and industrial pallets (100 x 120 cms.)

Kontorlandskab Squash faciliteter Lagerhotel Lagerhotel og Logistik Terminalkontor Lagerhotel Velkommen til OH Otto Hansen om vinteren Kantine

  JoomlaWatch Stats 1.2.9 by Matej Koval